Electrical quantity takeoff (QTO) support uses project drawings and specifications to identify, measure and organise quantities for tender preparation, procurement planning and cost development. The scope is agreed against the available drawing register and measurement rules.
Typical scope
- Review supplied drawings, revisions, legends and specifications
- Identify the electrical work items included in the agreed scope
- Measure quantities and organise them by system, area or drawing reference
- Record drawing references, assumptions, exclusions and items requiring clarification
- Prepare schedules in the agreed spreadsheet or BOQ format
Typical deliverables
- Itemised quantity takeoff schedules with descriptions, units and quantities
- Trade, system or area-based quantity summaries where requested
- Drawing reference and revision notes
- Clarification register for missing or conflicting information
Information to provide
Share the latest drawings, specifications, drawing register, project location, measurement standard, required breakdown and preferred file format. Pricing information is only included when it is part of the agreed scope.
Working process
The work begins with scope confirmation, followed by drawing review, quantity measurement, internal checks and delivery of the agreed schedules. Revisions are handled against the updated documents and agreed change scope.
Scope, measurement rules and deliverable format are confirmed before work begins.